      玻璃鋼防腐管道安裝要求
      時(shí)間:2022-07-05  瀏覽:5088次

        Requirements for installation of FRP pipes

        1、玻璃鋼防腐管道在安裝前應(yīng)對(duì)設(shè)備管口、預(yù)埋件、預(yù)留孔洞、鋼結(jié)構(gòu)等涉及管道安裝的內(nèi)容進(jìn)行復(fù)核。

        1. Before installation, the pipeline shall check the contents concerning the installation of the pipeline, such as the nozzle of the equipment, the embedded parts, the reserved holes and the steel structure.

        2、管道的坡度應(yīng)按圖紙的要求進(jìn)行調(diào)整,調(diào)整方法可以利用支座達(dá)到坡度要求,焊縫應(yīng)設(shè)置在便于檢修、觀察的地方。

        2. The gradient of the pipeline should be adjusted according to the requirements of the drawings. The adjusting method can use the support to meet the gradient requirements. The welding seam should be set in a place convenient for maintenance and observation.

        3、與傳動(dòng)設(shè)備連接的管道,安裝前內(nèi)部要處理干凈,焊接固定管口一般應(yīng)遠(yuǎn)離設(shè)備,以避免焊接產(chǎn)生應(yīng)力對(duì)傳動(dòng)設(shè)備安裝精度的影響。

        3. The pipeline connected with the transmission equipment should be cleaned before installation, and the fixed pipe mouth should be far away from the equipment to avoid the influence of welding stress on the installation accuracy of the transmission equipment.

        4、管道與機(jī)器連接前,應(yīng)防止強(qiáng)力相對(duì),在自由狀態(tài)下檢查法蘭的平行度和同軸度。

        4. Before connecting the pipe with the machine, the relative strength should be prevented, and the flange's parallelism and coaxiality should be checked under the free state.

        5、安全閥應(yīng)垂直安裝,在投入試運(yùn)行時(shí),要及時(shí)調(diào)校安全閥。安全閥的調(diào)校在系統(tǒng)上進(jìn)行,開啟和回座壓力要符合設(shè)計(jì)文件的規(guī)定。

        5, the safety valve should be installed vertically, and the safety valve should be adjusted in time for commissioning. The final adjustment of the safety valve is carried out on the system, and the opening and returning pressure must conform to the design documents.

        6、閥門安裝前,按設(shè)計(jì)文件核對(duì)其型號(hào),并按介質(zhì)流向確定其安裝方向。當(dāng)閥門與管道以法蘭或螺紋方式連接時(shí),閥門應(yīng)在關(guān)閉狀態(tài)下安裝;如以焊接方式安裝時(shí),閥門不得關(guān)閉。

        6. Before installing the valve, check its model according to the design document and determine its installation direction according to the medium flow direction. When the valve and pipe are flanged or threaded, the valve shall be installed in a closed state; if installed in a welded way, the valve shall not be closed.

        7、儀表元件的臨時(shí)替代:所有儀表元件安裝時(shí),均采用臨時(shí)元件替代,等試壓、沖洗、吹掃工作結(jié)束后,投料前再正式安裝。

        7. Temporary substitution of instrument components: All instrument components are installed with temporary components, and are formally installed before feeding after pressure test, flushing and purging.


      主站蜘蛛池模板: 小泽玛利亚一区二区在线| 免费无码肉片在线观看| 国产成人香蕉久久久久| 制服丝袜无码| 美女福利视频久久| 97精品国产自产在线观看永久| 自拍偷拍日韩| 亚洲成av人片久久| 国产成人免费高清激情视频| 国产在线观看www污污污| 国产精品视频超级碰| 18禁女裸乳扒开免费视频| 无码人妻丰满熟妇啪啪网不卡| 99久久人妻精品免费一区| 国产va亚洲va在线va| 亚洲综合色婷婷在线观看| 亚洲日韩中文无码久久| 4hu44四虎www在线影院麻豆| 国产精品岛国久久久久| 亚洲男人皇宫| 97香蕉久久国产超碰青草专区| 涩涩AV| 久久精品国产精品亚洲| 亚洲高清一区二区三区四区| 伊人久久免费| 成人小说一区二区三区| 波多野结衣AV不卡无码| 强制高潮18xxxx按摩| 久久精品女人天堂av麻| 国产熟女a?v| 精品a片| 一女被多男玩喷潮3p视频| 成人免费网站视频www| 超级碰碰碰| 亚洲免费观看| 国产成人亚洲综合色婷婷秒播| 三级在线看中文字幕完整版| 中文字幕乱码一区二区| 中文字幕一区二区三区久久| 午夜亚洲福利在线老司机| 精品国产99高清一区二区三区|